Standard Toilets

C5509P+CF1694LAW

C5509P+CF1694LAW
Toilet Type
Wall-Hung Toilet
Flush Type
Washdown
Nominal Water Consumption
4.8 L (4.2 / 6.0 L)
Water Efficiency Level
Level 2
Dimensions
535 × 365 × 350 mm
Product Combination
  • C5509P Wall-Hung Toilet
  • CF8062 Concealed Cistern
  • MB4111 / MB4121 Flush Panel
  • CF1694LAW Slow-Close Toilet Seat
Color
Powder White
Warranty
  • Ceramic: 10-year limited warranty
  • Tank fittings: 2-year limited warranty
  • Standard toilet seat: 1-year limited warranty

Functions

  • Concealed wall-hung configuration with a modern appearance
  • Rim-X Static Swirl technology
  • 4.2 / 6.0 L flushing volume with Level 2 water efficiency
  • Glazed trapway for smoother waste discharge
  • Fully skirted waterway for easier cleaning
  • Ultra-thin metal quick-release slow-close toilet seat
  • 9 mm ultra-thin flush panel
  • Concealed cistern surface wrapped with polystyrene to help prevent condensation on the wall at low temperatures

PROCUREMENT & LOGISTICS

How GrandEx manages your sourcing

We handle the entire supply chain—from factory selection in China to delivery at your
construction site in the U.S.

Direct Sourcing from China

Factory-direct relationships with verified aluminum window manufacturers across China.

Direct Sourcing from China
Supplier Coordination

We manage specification matching, sample approval, and production oversight.

Logistics Management

Container consolidation, customs clearance, and U.S. last-mile delivery.

Quality Control

Pre-shipment inspection and testing to ensure compliance with U.S. standards.

Project-Wide Support

Coordinate all material categories under one procurement contract.

TECHNICAL SUPPORT

Expert guidance for your project

GrandEx helps developers and contractors select suitable specifications, coordinate procurement across material categories, and manage logistics for residential and commercial construction projects.

Specification consulting and product selection
Sample coordination and approval
Custom sizing and finish options
Multi-category material consolidation
U.S.-based project management
Commercial building under construction with glass curtain wall and pallets of materials on site

Request a quote for
your next project.

Send us your BOM or project specs. We respond with a full landed-
cost quote within 48 hours.